During mining farm design, estimation of cost of operation is necessary topics to consider before design. The cost of electricity which I mentioned before, it is required 4 US Cents per kill Watt is ideal value. The ROI estimation is as following:
Initial expenses (IE)
1. Land
2. Mining building
3. Air cooling channel
4. (Or Mining RIG containers)
5. Contract of electricity per kill watt
6. Mining RIGs cost
7. Install cost (Network, setting of Mining RIGs)
8. Mining code optimization
9. Mining trading bot development
10. Pool design and its implementation
11. Security wallet establishment
Running expenses (RE)
1. Electricity cost
2. Land rental fee or tax for real estate.
3. Other Infrastructure running cost. (Water, network, etc)
Expectable reward (ER)
1. From mining
2. Crypto currency reward per RIGS.
3. From trading
4. Arbitrage
5. Crypto asset recycle investment
6. From IEO
7. Call IEO or token sale
Total (RTotal) estimated profits are:
RTotal= ER - (IE+RE)